MULTI-PROJECT SCHEDULING OF CONSTRUCTION PROJECTS WITH CONSTRAINED RESOURCES

Puneet Grover

Abstract


A company's portfolio in the construction industry includes a variety of projects, many of which are being executed at the same time. In such situations the performance of one project may have a positive or negative impact on the other. This research paper is an attempt to identify the challenges faced in a multi-project environment to propose multi-project scheduling approach, for the purpose of which a systematic review of the past literatures published in well-established journals with specific reference to multi-project environment and constrained resources is carried out and it is found that the major challenge faced in multi-project environment is the division and assignment of resource. A questionnaire survey is conducted to verify the identified challenges from literature and determine the project scenarios faced in the industry. The findings of which indicate that the major challenge faced in multi-project environment is the division and assignment of resources and 87.9% of the total respondents have executed projects in a multi-project environment out of which 76% projects are executed in parallel from start to end.

Subsequently, the paper analyzes analytical and heuristic approaches for resource allocation along with a centralized and de-centralized system of scheduling. In the end, the concepts presented in this paper are applied over a live case study and the results of both centralized and de-centralized approach are compared. The data obtained from comparison is analyzed to obtain additional hiring of resources required for the completion of projects and also highlighting the capabilities and limitations of different approaches.


Full Text:

PDF PDF

References


K. Marimuthu, P. Ekambaram, B. Behrooz, R. Benny and K. Ananthanarayanan, "An overview of multi-project scheduling problems in India with resource constrained and unconstrained settings," 2017.

J. S. Pennypacker and L. D. Dye, "Project Portfolio Management and Managing Multiple Projects: Two Sides of the Same Coin?," 2000.

A. Moza, V. K. Paul and S. K. Solanki, "Evaluating Project Complexity in Construction Sector in India," Journal of Engineering Research and Sciences, 1(5): 198-212, 2022, 2022.

J. We˛glarz, J. Józefowska, M. Mika and Grzeg, "Project scheduling with finite or infinite number of activity processing modes – A survey," 2011.

S. K. Solanki and V. K. Paul, "Comparison between service life prediction methods for building rehabilitation: application on a case study," Journal of Building Pathology and Rehabilitation (2022) 7:51 https://doi.org/10.1007/s41024-022-00194-x, 2022.

M. S. El-Abbasy, A. Elazouni and T. Zaye, "Generic Scheduling Optimization Model for Multiple Construction Projects," 2018.

W. Herroelen, "Research Report on Project Scheduling, Vol-17," 2004.

PMI; KPMG;, "Study on Project Schedule and Cost Overruns," 2012.

M. P. Venkatesh, S. M. Renuka and B. Malathi, "Evaluation of Critical Factors Influencing Resource Allocation in Indian Construction Projects," 2012.

Educba, "Introduction to Project Scheduling Techniques," 2020.

E. Kapoor, S. K. Solanki and V. K. Paul, "Cost benefit analysis for rehabilitation of buildings: case of Indian Medical Association, New Delhi.," International Journal of Structural Engineering, 10.1504/IJSTRUCTE.2021.10043508., 2022.

Asana, "Critical path method: How to use CPM for project management," 2021.

Sebastian, "PDM – Precedence Diagramming Method [FS, FF, SS, SF] (+Example).," 2022.

PMI, A Guide to the Project Management Body of Knowledge 6e., 2017.

J. Rodriguez, "Construction Scheduling Techniques," 2018.

S. K. Solanki, R. Rastogi and V. K. Paul, "Cost Analysis of Functional Retrofitting Measures in Buildings," Journal of The Institution of Engineers (India): Series A (2022, 103 (3), 725-732, 2022.

M. Rajgor, P. Chauhan, D. Patel and Pancha, "Effective Techniques for Finding Delay in Construction Project," 2016.

S. Madaan, "Project Scheduling Techniques," Haryana, 2018.

C. Vercellis, "Constrained multi-project planning problems: A Lagrangean decomposition approach.," 2000.

K. Marimuthu, P. Ekambaram, B, R. Benny and K. Ananthanarayanan, "Resource Unconstrained and Constrained Project Scheduling Problems and Practices in a Multiproject Environment," 2018.

R. Rastogi, V. K. Paul and S. K. Solanki, "Analyzing the Impact of Challenges in Prefabricated Building Construction Supply Chains.," 2022.

H. Gokhale, "Multi-Project Scheduling: Case Study of highways," 1986.

S. Hartmann and D. Briskorn, "A survey of variants and extensions of the resource-constrained project scheduling problem," 2010.

M. Engwall and A. Jerbrant, "The resource allocation syndrome: the prime challenge of multi-project management?," 2003.

E. Demeulemeester, F. Deblaere, J. Herbots and O. Lam, "A Multi-level Approach to ProjectManagement under Uncertainty," 2007.

S. Lambourn, "Resource Allocation and Multi-Project Scheduling (RAMPS)," 1993.

M. Benameur, "Project Scheduling Under Constrained Resources," 1978.

D. Krüger and A. Scholl, "A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times," 2009.

F. Usmani, "Resource Leveling vs Resource Smoothing.," 2018.

A. Singh, "Resource Constrained Multi-Project Scheduling with Priority Rules & Analytic Hierarchy Process," 2014.




DOI: https://doi.org/10.37628/ijsdt.v5i2.962

Refbacks

  • There are currently no refbacks.