Analysis of Key Factors Affecting Labour Productivity in Building Rehabilitation Projects

Khushbu Vishwakarma, V. K. Paul, Sushil Kumar Solanki

Abstract


Productivity is a very challenging aspect and momentous concern in construction industry because it controls the overall project performance. Complications are typically related to the labour performance. In the construction sector, there are several internal and external aspects that are variables and are terribly troublesome to predict. Also, this results to never-ending deviation in productivity of labours we tend to come through at sites, so it’s momentous to assure decrease in productivity doesn't cause time and cost over runs in the project. Besides these challenges rehabilitation projects get even complex due to various parameters such as ageing, fire mishap, overloading etc. There are numerous prerequisites involved before initial assessment of rehabilitation projects which in turn sometimes add to time delays and quality control. Rehabilitation projects needs to identify parameters resulting in decline of productivity and address these factors in order to enhance the performance of the project. To address this, the current study aims to identify and analyze the critical factors influencing labour productivity in building rehabilitation projects. For doing so, factors that affect labour productivity are identified from the literature (secondary sources) as well as from case studies (primary sources) are clubbed to form a comprehensive list. The identified factors are analysed using statistical tools to obtain the critical factors influencing labour productivity of rehabilitation projects on site using questionnaire surveys and suitable recommendations are proposed to improve labour productivity using the acquired results. According to the results of an examination of 50 identified factors, the significant factors affecting labour productivity are: Design complexity due to uncertain nature of projects, Inefficient crew composition, Missing design information, Unavailability of relevant guidelines and methodology, Lack of contractor expertise for rehabilitation work, Large distance between material storage and work location, No space to keep enough material near work location, Inexperienced or unskilled worker, Site congestion and obstructions, and Degradation of undamaged materials and equipment during rehabilitation works. The project team will be able to improve onsite labour management and overall project performance by prioritising these factors that affect labour productivity.

Full Text:

PDF

References


Alinaitwe, M. H. (2007). Factors affecting the productivity of building craftsmen - studies of Uganda. Journal of Civil Engineering and Management, 169–176.

Borcherding, F.‐S. L. (1986). Work Sampling Can Predict Unit Rate Productivity. Journal of Construction Engineering and Management.

Clarkson H. Oglesby, H. W. (1988). Productivity Improvement In Construction . Mcgraw Hill Series In Construction Engineering And Project Management.

Drewin, F. J. (1982). Elsevier Science Ltd. Measurement and improvement through work study.

Ellis, Z. H. (1990). Research of factors influencing construction productivity. Journal Construction Management and Economics, 49-61.

Gilleard, J. D. (1992). The creation and use of labor productivity standards among specialist subcontractors in the construction industry. Cost engineering journal, 11-16.

Hansson, A. M. (2007). Factors affecting the productivity of building craftsmen - studies of Uganda. Journal of Civil Engineering and Management, 169–176.

Horner, R. M. (1996). Effects of Accelerated Working, Delays and Distruption on Labour Productivity. Chartered Institute of Building.

Jergeas, G. F. (1994). Contractors’ protection against Construction claims.

Kumari, R. a. (2018). Analysis of Factors Affecting on Labour Productivity in Construction Industry by Using RII Method. International Journal of Pure and Applied Mathematics.

Lema, N. M. (1996). Construction labour productivity analysis and benchmarking: the case of Tanzania.

Lowe, J. G. (1987). The measurement of productivity in the construction industry.

Odesola, I. A. (2015). Construction Labour Productivity as a Correlate of Project Performance: An Empirical Evidence for Wall Plastering Activity. Civil Engineering Dimension.

Shashank, H. a. (2014). Analysis of key factors affecting the variation of labour productivity in construction projects. International journal of emerging technology and advanced engineering, 152-160.

Shinde, V. J. (2017). A Review on Productivity Improvement in Construction Industry. International Research Journal of Engineering and Technology, 210–215.

States, U. (2016). The National Historic Preservation Act.

Thomas, H. (1991). Labor productivity and work sampling: The bottom line. Journal of Construction Engineering and Management.

Ali, A. S., & Rahmat, I. (2009). Methods of coordination in managing the design process of refurbishment projects. Journal of Building Appraisal, 5(1), 87–98. https://doi.org/10.1057/jba.2009.13

Alinaitwe, H. M., Mwakali, J. A., & Hansson, B. (2007). FACTORS AFFECTING THE PRODUCTIVITY OF BUILDING CRAFTSMEN ‐ STUDIES OF UGANDA. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 13(3), 169–176. https://doi.org/10.3846/13923730.2007.9636434

Alinaitwe, H., Mwakali, J., & Hansson, B. (n.d.). Labour Productivity in the building industry. 11.

Chandar, S. S. (2014). Rehabilitation of Buildings. 6.

Dabaieh, M., Makhlouf, N. N., & Hosny, O. M. (2016). Roof top PV retrofitting: A rehabilitation assessment towards nearly zero energy buildings in remote off-grid vernacular settlements in Egypt. Solar Energy, 123, 160–173. https://doi.org/10.1016/j.solener.2015.11.005

Daoud, O. E. K. (1997). The Architect/Engineer’s Role in Rehabilitation Work. Journal of Construction Engineering and Management, 123(1), 1–5. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:1(1)

Desirée Alba-Rodríguez, Marrero, M., & Solís-Guzmán, J. (n.d.). Economic and Environmental Viability of Building Recovery in Seville (Spain) Phase 1: Database in Arcgis. 6.

Dolage, D. A. R., & Chan, P. (2013). Productivity in Construction-A Critical Review of Research. Engineer: Journal of the Institution of Engineers, Sri Lanka, 46(4), 31. https://doi.org/10.4038/engineer.v46i4.6808

Galiano-Garrigos, A., González-Avilés, Á., Rizo-Maestre, C., & Andújar-Montoya, M. (2019). Energy Efficiency and Economic Viability as Decision Factors in the Rehabilitation of Historic Buildings. Sustainability, 11(18), 4946. https://doi.org/10.3390/su11184946

Gundecha, M. M. (2012). A Paper Submitted to the Graduate Faculty Of the North Dakota State University Of Agriculture and Applied Science. 76.

Manfredi, V., & Masi, A. (2018). Seismic Strengthening and Energy Efficiency: Towards an Integrated Approach for the Rehabilitation of Existing RC Buildings. Buildings, 8(3), 36. https://doi.org/10.3390/buildings8030036

National Preservation Act, 1966.pdf. (n.d.).

Paul, V. K. & Seth, V., 2017. Benchmarking and Objective Selection of Technologies for Housing in India Using Quality Function Deployment. Journal of Construction in Developing Countries, 22(1), pp. 63-78.

Paul, V. K., Khursheed, S. & Singh, R., 2017. Comparative Study of Construction Technologies for Underground Metro Stations in India. International Journal of Research in Engineering and Technology, 6(3), pp. 55-63.

Qualharini, E. L., Oscar, L. H. C., & Silva, M. R. da. (2019). Rehabilitation of buildings as an alternative to sustainability in Brazilian constructions. Open Engineering, 9(1), 139–143. https://doi.org/10.1515/eng-2019-0017

Seshadhri, G. & Paul, V. K., 2017. Intervention Strategy for Enhanced User Satisfaction Based on User Requirement Related BPAs for Government Residential Buildings. New York, International Conference on Sustainable Infrastructure 2017.

Seshadhri, G. & Paul, V. K., 2018. Validation and ranking of user requirement related building performance attributes and sub attributes for government residential buildings. Facilities.

Vekaria, S. G. (2012). Labour Productivity in Contruction. 7.




DOI: https://doi.org/10.37628/ijsdt.v5i1.901

Refbacks

  • There are currently no refbacks.