Critical study on methods and approaches to mitigate delay in construction.
Abstract
Full Text:
PDFReferences
Adeyemi AY, Kashiwagi DT. Non-sustainability of low-bid infrastructure procurement system: lessons for developing countries. Certif Int J Eng Innov Technol. 2008; 4 (6): 244–251.
Al Saeedi AS, Karim AM. Major factors of delay in developing countries construction projects: critical review. Int J Acad Res Bus Soc Sci. 2022; 12 (5). DOI: 10.6007/IJARBSS/v12-i5/13309.
Agrawal A, Halder S. Identifying factors affecting construction labour productivity in India and measures to improve productivity. Asian J Civ Eng. 2020; 21 (4): 569–579. DOI: 10.1007/s42107-019-00212-3.
Ansari AM, Syed DR, Ahmad K. Study on the causes of delay in a construction project and recommendation. Int J Adv Res Innov Ideas Edu.2019; 5 (4): 298–315.
Vishal M, Myneni K. Causes and impact of delay in construction industry of India. Int J Eng Tech Mgmt Res. 2021; 8 (1): 35–44. DOI: 10.29121/ijetmr.v8.i1.2021.851.
Azeez LI, Radmehr M. The investigation of the role of RFID in mitigating delay factors in construction projects. Teh vjesn. 2022; 29 (3): 933–942. DOI: 10.17559/TV-20210609212045.
Carvalho AB, Maués LMF, Moreira Fde S, Reis CJL. Study on the factors of delay in construction works. Ambiente Construído. 2021; 21 (3): 27–46. DOI: 10.1590/s1678- 86212021000300536.
Basu C, Chouksey R, Bawania V, Paul VK. PreConstruction measures to prevent delay in construction of residential highrise project. Int J Creat Res Thoughts. 2020; 8 (7): 3362–3374.
Costin AM, Teizer J, Schoner B. RFID and BIM-enabled worker location tracking to support realtime building protocol control and data visualization. J Inf Technol Constr. 2015; Available at https://www.itcon.org/papers/2015_29.content.08252.pdf [Accessed on May 2023]
Valero E, Adán A, Cerrada C. Evolution of RFID applications in construction: a literature review. Sensors. 2015; 15 (7): 15988–16008. DOI: 10.3390/s150715988.
Ballard G, Tommelein I, Koskela L, Howell G. (2007). Lean construction tools and techniques. Available at https://leanconstruction.org.uk/wp content/uploads/2018/09/Ballard-et-al.-LeanConstruction-tools-and-techniques.pdf [Accessed on May 2023]
Gowda MN, Chethana M. Delay analysis of a construction project-a case study. Int Res J Eng Technol. 2020; 7 (2): 1728–1730.
Kim Y, Roh S, Kim W, Lee J, Kwak Y. Case study of risk management for high-rise buildings using a control chart: schedule management of 72 the Busan M tower residential apartment
complex. Int J Sustain Build Technol Urban Dev. 2019; 10 (3): 136 146. DOI:10.22712/susb.20190014.
Zhang J, Cheng JCP, Chen W, Chen K. Digital twins for construction sites: concepts, LoD definition, and applications. J Manag Eng. 2022; 38 (2). DOI: 10.1061/(ASCE)ME.1943-
0000948.
Kamandang ZR, Casita CBudi. Delays in construction project: a review. IJPS. IPTEK J Proc Ser. 2018: (6). DOI: 10.12962/j23546026.y2018i6.4631.
Zidane YJ-T, Andersen B. The top 10 universal delay factors in construction projects. Int J Manag Projects Bus. 2018; 11 (3): 650–672. DOI: 10.1108/IJMPB-05-2017-0052.
Refbacks
- There are currently no refbacks.